Le Musée to embark on meticulous and systematic projects together.

We are leading the most meticulous and systematic sculpture projects in South Korea.

Sculptures, which have three-dimensional imagery, are among the most preferred art content for corporate and institutional clients.
Le Musée is the only art project specialist in South Korea responsible for systematic sculpture projects, covering everything from planning and design to practical design work, production, transportation, and installation.
As a specialized project company handling all materials such as FRP, bronze, metal, and stone, we promise to continue offering creative planning/design and smooth project execution for all involved.

Process

  • Inquiries & Planning
  • Design & Engineering
  • Production
  • Transportation
  • Installation

Architectural Art Review
Approval Within the Given Period

Review - Production - Installation - Inspection
Full Process Management

Review?

The Architectural Art Review is a system that applies to new constructions or extensions of buildings with a total floor area of 10,000 square meters or more. Under this system, a certain percentage of the construction cost must be allocated to either.

Installing an artwork such as paintings, sculptures, or crafts, or Contributing 70% of the installation cost as a donation.
Applications for fund contributions can be submitted through the Public Art Portal (www.publicart.or.kr).

The Architectural Art Review System was established to promote culture and the arts. Since its implementation in 1972, it has aimed to provide artistic spaces for citizens, enhance the cultural image of urban environments, and create opportunities for artists. The system became mandatory in 1995.

Standard Procedure

  • 1 Review Preparation
    • Confirm eligibility for mandatory artwork installation
    • Calculate the artwork reporting cost
    • Select Public Sculptures that can be Recognized as Artworks (e.g., fountains, benches) by Le Musée affiliated artists or other artworks

    We recommend a list of artists with high approval rates for reviews, based on region and building type.

  • 2 Review Application
    • Confirm the application period (varies by local government)
    • Prepare over 20 review documents
    • Review committees are held approximately once a month, depending on the local government’s criteria

    Please provide only the architectural overview. All documents will be prepared and submitted by Le Musée.

  • 3 Review Process
    • Art reviews are held by each city/provincial government
    • 2/3 of the 10-20 members, including the chairperson, must be present reviews are approved if the artwork scores 60 or more
    • In case of re-review, all documents must be revised and re-submitted for the review process

    We boast a 90% first-pass approval rate with the know-how to pass the review on the first attempt.

  • 4 Artwork Installation
    • Production and installation of selected artwork
    • Ensure stability through structural calculations
    • On-site foundation work and surrounding finishing

    Le Musée guarantees the quality and maintenance of sculptures with works from top-tier domestic artists.

  • 5 Installation Confirmation
    • Prepare site inspection documents for building installation approval
    • Conduct site inspection (2 visitors: review committee members and district officials)
    • Send final completion notice

    We ensure perfect care until the receipt of the "Artwork Installation Confirmation", which is one of the required documents for the building completion application.